| Resume a previously saved form
Resume Later

In order to be able to resume this form later, please enter your email and choose a password.

GOODS MOVEMENT EMISSION REDUCTION GRANT PROGRAM

BAAQMD TRANSPORT REFRIGERATION UNIT (TRU)
REPLACEMENT APPLICATION

      

375 Beale Street, Suite 600, San Francisco, CA 94105

www.baaqmd.gov/goods

PART I - Applicant Contact and Project Information   


Complete only 1 copy of Part I and a copy of Part II for each unit of equipment of the proposed project

APPLICANT INFORMATION


Mailing Address


CONTACT INFORMATION
  Name   E-mail   Phone   Fax
Primary Project Contact
Person(s) with Authority to Sign contracts (owner)
Person who completed application
If a Third Party (e.g. engine dealer, distributor, or consultant, etc.) assisted the Applicant to complete the application, complete this section:



Applicant must read and checkmark the box for each item below to indicate understanding and agreement
Yes
Yes

I certify that I have the legal authority to apply for funding on behalf of the applicant entity, and that I am authorized to sign and submit this application on behalf of the applicant/equipment owner.
(Authorized Representative of Applicant/ Equipment Owner)
PART II - Equipment Information for Proposed Project


EQUIPMENT INFORMATION 

(Complete one Equipment section for each unit you are applying for. Add additional units by using the "Add another response" link at the bottom right of the section.)

EXISTING EQUIPMENT
Transportation Refrigeration Unit (TRU)
Truck (for truck TRUs only)
Equipment Vocation
PROPOSED REPLACEMENT EQUIPMENT
FUNDING
Please select ONE project option by fuel type and funding amount:                                                                                            
You may request an amount lower than the funding options shown to enhance the project cost-effectiveness score.


CHARGING OR FUELING INFRASTRUCTURE 

(Complete one facility description for each facility where installation of charging or fueling infrastructure is proposed. Add additional facilities by using the "Add another response" link at the bottom right of the section.)

FACILITY INFORMATION


Applicant must provide documentation for TRU usage at the facility for each of the past two years


Charging or Fueling Infrastructure Applications (including grocery retail projects) - Attach a brief written proposal describing required elements of infrastructure project proposal as outlined in 2015 Guideline Appendix F (pp. F-1 through F-10) and include itemized quotation/s for all project costs.

FUNDING
Please select ONE project option by fuel type and funding amount:                                                                                            
You may request an amount lower than the funding options shown to enhance the project cost-effectiveness score.

SITE OWNER PROJECT ACKNOWLEDGEMENT - the grantee must provide a signed and dated letter from site owner with the following acknowledgement

1. The equipment owner will be allowed to install and operate the Program-funded equipment at the site address.
2. Program-funded equipment will be the property of the applicant listed in the equipment project application.
3. The local agency, ARB or their designees will be allowed to access the site, equipment and associated records for inspections, Program reviews or fiscal audits.

I acknowledge I am the site owner of this facility and agree to this Site Owner Project Acknowledgement, at a minimum, for the duration of the project term.

DOCUMENTATION
Applicant must upload the following attachments using the online system, email attachment, or fax: 








CONTACT BAAQMD: 

For questions and comments, please contact Air District staff at (415) 749-4994 (option 1) or by email at grants@baaqmd.gov.