SnapCab Elevator Academy Quiz
First Name
Last Name
Company
Email Address
1. When storing a SnapCab crate, what is the recommended temperature range that the crate should be stored in?
50-70 degrees
60-80 degrees
Room Temperature
Does Not Matter
2
. When installing a SnapCab, what should be installed in your cab shell first?
Finished Ceiling
Reveals
Toe Kick Spacer Blocks
Wall Panel Top Cap
3. Which wall panel layer is to be mounted “first” after the bottom toe kick flats and toe kick binders have been set?
Layer 4
Layer 3
Layer 2
Layer 1
4. What size through-hole is should be drilled for mounting Island Ceiling threaded rod and toggle bolt leg brackets?
1"
2"
1/4"
1-1/4"
5. If you were looking “into” an elevator from outside the door(s) (hallway), BY SNAPCAB STANDARDS, which wall would be considered your “right wall”?
The wall closest to your left hand
The wall closest to your right hand
Your choice as long as you mark it on the order form
Not relevant to the order form
6. How many ceiling leg brackets are considered sufficient for a standard sized (2000# & 2500# capacity) economy ceiling or frame ceiling?
2
6
4
9
7. What is the name of the supplied piece from the installation kit that helps from damaging the panel face with a drill chuck?
Toe kick block
Paper towel
Shims
Drill guide
8. True or False: You won’t need to clean the existing surface when installing a SnapCab because all the materials will be mechanically fastened.
True
False
9. What should you do if your SnapCab crate arrives and there is visible damage to the crate?
Kick the driver
Reject the shipment
Open and inspect for damage
Complain and bring up with SnapCab Project Manager
10. Who should be contacted at SnapCab to do a design session meeting and answer sales questions?
Interior Specialist
Shop Foreman
Project Manager
Owner/CEO
Total Right:
Contact Information