Damage Section Only - Please fill out
Work Date
Work Order Name
Job Order
Job Name
Arborist
Estimated Hours
Site
106 Glenn Circle, Decatur, GA, 30030
*********LINE ITEM ***********
Type of Work/Service Name:
Price
Notes from Arborist
Service Description
<p>Project Price:</p><p> </p><p> </p><p>Hourly rate for 4-man crew with standard tree care equipment- $640($160/man hour) 23.33 hours x $160= $3,732</p><p>Hourly rate for additional equipment used: a full sized tractor- $40 x 6 = $240</p><p>40 Ton crane - $100/hr x 6 = $600</p><p>Man lift - NOT USED, no charge</p><p>Wood disposal fee- $400</p><p> </p><p>Total= $4,972</p><p> </p><p> </p>
TRPs, Closures, Tasks, Waivers, etc.
3/13 started waiting for 2 year agreement MAK EMERGENCY PERMIT: Boutte Tree will apply for a Dead, Dying or Hazardous(DDH) tree removal permit from the City of Decatur Arborist Division which includes an application fee.
Post Job Questions:
Work Order Line Item #
Internal Notes
Service Description
<p>HIGH PRIORITY IMMEDIATE EMERGENCY SERVICE:</p><p>-This is a "price to be determined" job which will be billed hourly with standard company rates for labor and equipment based on the urgency. An inspector from Boutte Tree will determine the exact size equipment/crane needed, whether scaffolding is required, and any other needs to create a safe jobsite and make for a successful, efficient project.</p><p>-Accelerated scheduling due to high probability of possible thunderstorms and unknown risk of additional property damage. Tree removal and tarping to mitigate interior damage to the house due to water damage.</p><p> </p><p>Hourly rate for 4 man crew with standard tree care equipment- $640</p><p>Hourly rate for additional equipment used: a full sized tractor- $40</p><p>40 Ton crane - $100</p><p>Man lift - $75</p><p>Wood disposal fee- $400</p><p> </p><p>Total= hourly rate at end of job + wood disposal ($400)</p><p>Not to exceed $10,000</p><p> </p><p> </p><p>Scope of Work: Remove hazardous Loblolly Pine in back yard left fence line. Tree has shear plane/ vertical crack at base and has shifted, tree is leaning against another tree.</p><p>Arborist: Explain project in detail with logistics, setup, operations, and thoroughly discuss protecting property and reducing additional damage with efforts and timing</p><p> </p><p>General Notes:</p><p>-Work will be completed in a manner that is safe for tree crew. The work site must be secured- tree, electrical, and structural hazards must be mitigated</p><p>-Work completed in accordance with, “ANSI Z133 Standards”.</p><p>-Additional damage to House and Structures during removal avoided as much as possible.</p>
Type of Work/Service Name:
Price
Work Order Line Item #
Internal Notes
Service Description
<p>Perform consulting by an ISA certified arborist</p><p> </p><p></p><p> </p><p>Work will be billed at an hourly rate of $150/hr, including travel if there are site inspections</p><p> </p><p></p><p> </p><p>The work is estimated to take 1.5 hours</p><p> </p><p></p><p> </p><p>Job Description: Apply for permit to remove extreme hazardous Loblolly Pine in back yard.</p><p> </p><p>Fulfill permitting requirements:</p><p>Roughly 20" Loblolly Pine at back left of property</p><p>Actively failing tree with vertical crack in base of tree and increased lean.</p><p> </p><p>TRAQ form filled out for each tree being removed</p><p>Calculate:</p><p>Existing canopy: 8858 squareFt or 66%</p><p>Canopy being removed: 530 squareFt</p><p>Canopy to be replaced: 530 square Ft</p><p>Assist with creating a planting plan to satisfy the city's canopy coverage requirements</p><p>The client will need to sign and notarize a Tree Maintenance Agreement as part of the permitting process</p>
Type of Work/Service Name:
Price
Work Order Line Item #
Internal Notes
Service Description
<p>Project Price:</p><p> </p><p> </p><p>Hourly rate for 4-man crew with standard tree care equipment- $640($160/man hour) 23.33 hours x $160= $3,732</p><p>Hourly rate for additional equipment used: a full sized tractor- $40 x 6 = $240</p><p>40 Ton crane - $100/hr x 6 = $600</p><p>Man lift - NOT USED, no charge</p><p>Wood disposal fee- $400</p><p> </p><p>Total= $4,972</p><p> </p><p> </p>
Type of Work/Service Name:
Price
Task Status
Unproductive Yard Time Crew Hours
example: 1.5 for hour and a half
Travel Time Crew Hours
example: 2.25 for 2 hours and 15 minutes
Hours Worked on Site Crew Hours
example: 3.75 for 3 hours and 45 minutes
Was Anyone Injured
Please select...
Yes
No
Name of Injured Worker
Please select...
Alex Soriano
Antulio Giron
Benjamin Johnston
Bryan Martinez Del Rello
Diego Ivan Martinez
Dirk Brown
Erick Reyes
Falarryo Buckley
Gabriel Martinez
Gerber Lopez
Hudson Hames
Itxenia Cortez
Jessie Walker
John "Frank" DeFrances
John Hathaway
Jonathan Covarrubias
Jorge Antonio Araujo
Jorge Vasquez
Josh Turner
Juan Jose Mendoza
Leonardo Hernandez
Ludwin Quintanilla
Martin Rangel
Miguel Hernandez
Nahun Lemus
Ricardo Cano
Sal Aguilar
Saul Arriaza
Steven Gernatt
Steven Sindall
Tierson Boutte
Tyler Baxter
Walter McClung
Yovaniel Rivera
Zach Moore
Explain injuries:
Injury Date
Injury Time
Injury Day of the Week
Please select...
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Injury Site Conditions (grade, terrain, proximity to targets, etc.)
Please select...
Grade
Terrain
Proximity to targets
Other
If Other, please explain:
Injury Environmental Conditions
Please select...
Heat
Sun
Rain
Wind
Other
If Other, please explain:
Injury Risk Anticipated and/or documented in Job Site Safety Briefing/in Pre-Job Safety?
Please select...
Yes
No
Please Explain Injury Risks Anticipated
Were there any damages?
Please select...
Yes
No
Type of Damage
Please select...
Property Damage
Equipment Damage
Other
Explain Damages:
How did the damage occur?
Did the damage occur at the client's property or at a different property? (neighbor, different unit, etc)
Please select...
Damage is at Client's Property
Damage is at a different property (neighbor, or different unit, etc.)
What is the address and contact information of where the damage took place?
Where on the property did the damage occur?
Was customer notified of damage?
Please select...
Yes
No
N/A
Additional Damage Information
Damage Date:
Damage Time
Please select...
7 am
7:15 am
7:30 am
7:45 am
8 am
8:15 am
8:30 am
8:45 am
9 am
9:15 am
9:30 am
9:45 am
10:00 am
10:15 am
10:30 am
10:45 am
11 am
11:15 am
11:30 am
11:45 am
12 pm
12:15 pm
12:30 pm
12:45 pm
1 pm
1:15 pm
1:30 pm
1:45 pm
2 pm
2:15 pm
2:30 pm
2:45 pm
3 pm
3:15 pm
3:30 pm
3:45 pm
4 pm
4:15 pm
4:30 pm
4:45 pm
5 pm
5:15 pm
5:30 pm
5:45 pm
6 pm
6:15 pm
6:30 pm
6:45 pm
7 pm pm
7:15 pm
7:30 pm
8 pm
after 8 pm
Damage Day of the Week
Please select...
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Damage Site Conditions (grade, terrain, proximity to targets, etc.)
Please select...
Grade
Terrain
Proximity to Targets
Other:
If Other, please explain:
Damage Environmental Conditions
Please select...
Heat
Sun
Rain
Wind
Other
If Other, please explain:
Damage Risk Anticipated and/or documented in Job Site Safety Briefing/in Pre-Job Safety?
Please select...
Yes
No
Please explain damage risks anticipated
Which workers were involved in the damage?
Please select...
Alex Soriano
Antulio Giron
Benjamin Johnston
Bryan Martinez Del Rello
Carlos Garcia
Christian Malcolm
Curtis Miller
Daniel Molina
Diego Ivan Martinez
Dirk Brown
Edward Kelemencky
Erick Reyes
Falarryo Buckley
Gabriel Martinez
Gerber Lopez
Gustavo Carillo
Isaiah Coffey
Israel Martinez
Jacob Jenkins
Jonathan Covarrubias
Jorge Antonio Araujo
Josh Turner
Juan Jose Mendoza
Juan Laracuente
Juells Dorton
Julio Cesar
Leonardo Hernandez
Marcelo Barrera
Marcos Martinez
Martin Rangel
Milton Polio
Nahun Lemus
Orlando Misael Diaz Morales
Osvaldo Martinez
Ricardo Cano
Sal Aguilar
Stephen "Fletch" Locke
Stephen Sindall
Sterling Copeland
Thomas Cross
Tierson Boutte
Tyler Baxter
Yovaniel Rivera
Zach Moore
How should fault be assigned?
Photos of damage
Pre-Photo 1
Pre-Photo 2
Pre-Photo 3
Pre-Photo 4
Photos
Photo 1
Photo 3
Photo 2
Photo 4
Do Not Remove
Work Order Type
Work Order ID
Contact Information