Damage Section Only - Please fill out
Work Date
Work Order Name
Job Order
Job Name
Arborist
Estimated Hours
Site
3015 Andrews Dr NW, , , 30305
*********LINE ITEM ***********
Type of Work/Service Name:
Price
Notes from Arborist
Service Description
<p>Perform the Following Tree Work:</p><p>The pruning objective is to provide clearance and improve aesthetics.</p><p> </p><ol><li><span style="font-size: 11pt;">Prune to remove deadwood from the Maple at the rear corner of the detached garage. </span></li><li><span style="font-size: 11pt;">Provide 4-6' of clearance at the left front corner of the house (back to the street).</span></li><li><span style="font-size: 11pt;">Fully REMOVE the dying Dogwood at the right front of the house (back to the street).</span></li><li><span style="font-size: 11pt;">Prune to remove the lowest limb from the Magnolia tree along the right side front yard near the path, new plantings, and bridge. Crew: See marked photo.</span></li></ol><p> </p><p> </p><p>Cut stumps as low as practicable on removals. Chip brush, haul remaining wood and debris from site.</p>
*********LINE ITEM ***********
Type of Work/Service Name:
Price
Notes from Arborist
Service Description
<p>Two-lead Deodor Cedar at motorcourt side of house.</p><p> </p><p>Install 3/8"EHS (extra high strength) grade, 7-strand, steel cable(s) to add supplemental support to weak branch/trunk unions and reduce the risk of failure.</p><p> </p><p>Attach the cables between the main leaders about 2/3 of the distance to the top of the canopy above their dividing point. This is above the location of the present cable, which shall be removed.</p><p>The cable system will be one linear cable.</p><p> </p><p>Cabling will reduce the risk of stem breakage as a result of weak unions, but it does not reduce the risk of uprooting failure.</p><p>NOTE: Cables are neither a permanent remedy to structural weaknesses, nor a guarantee against failure. Cables should be inspected periodically by a Certified Arborist and adjusted or repaired if necessary.</p><p>Tree support systems installed and maintained according to ANSI A300 (part 3) 33.6.2.1 standards for Cabling, Bracing and Guying. It is the responsibility of the client to arrange for inspection of the structural support system.</p>
TRPs, Closures, Tasks, Waivers, etc.
Post Job Questions:
Work Order Line Item #
Internal Notes
Service Description
<p>Perform the Following Tree Work:</p><p>The pruning objective is to provide clearance and improve aesthetics.</p><p> </p><ol><li><span style="font-size: 11pt;">Prune to remove deadwood from the Maple at the rear corner of the detached garage. </span></li><li><span style="font-size: 11pt;">Provide 4-6' of clearance at the left front corner of the house (back to the street).</span></li><li><span style="font-size: 11pt;">Fully REMOVE the dying Dogwood at the right front of the house (back to the street).</span></li><li><span style="font-size: 11pt;">Prune to remove the lowest limb from the Magnolia tree along the right side front yard near the path, new plantings, and bridge. Crew: See marked photo.</span></li></ol><p> </p><p> </p><p>Cut stumps as low as practicable on removals. Chip brush, haul remaining wood and debris from site.</p>
Type of Work/Service Name:
Price
Work Order Line Item #
Internal Notes
Service Description
<p>Two-lead Deodor Cedar at motorcourt side of house.</p><p> </p><p>Install 3/8"EHS (extra high strength) grade, 7-strand, steel cable(s) to add supplemental support to weak branch/trunk unions and reduce the risk of failure.</p><p> </p><p>Attach the cables between the main leaders about 2/3 of the distance to the top of the canopy above their dividing point. This is above the location of the present cable, which shall be removed.</p><p>The cable system will be one linear cable.</p><p> </p><p>Cabling will reduce the risk of stem breakage as a result of weak unions, but it does not reduce the risk of uprooting failure.</p><p>NOTE: Cables are neither a permanent remedy to structural weaknesses, nor a guarantee against failure. Cables should be inspected periodically by a Certified Arborist and adjusted or repaired if necessary.</p><p>Tree support systems installed and maintained according to ANSI A300 (part 3) 33.6.2.1 standards for Cabling, Bracing and Guying. It is the responsibility of the client to arrange for inspection of the structural support system.</p>
Type of Work/Service Name:
Price
Task Status
Unproductive Yard Time Crew Hours
example: 1.5 for hour and a half
Travel Time Crew Hours
example: 2.25 for 2 hours and 15 minutes
Hours Worked on Site Crew Hours
example: 3.75 for 3 hours and 45 minutes
Was Anyone Injured
Please select...
Yes
No
Name of Injured Worker
Please select...
Alex Soriano
Antulio Giron
Benjamin Johnston
Bryan Martinez Del Rello
Diego Ivan Martinez
Dirk Brown
Erick Reyes
Falarryo Buckley
Gabriel Martinez
Gerber Lopez
Hudson Hames
Itxenia Cortez
Jessie Walker
John "Frank" DeFrances
John Hathaway
Jonathan Covarrubias
Jorge Antonio Araujo
Jorge Vasquez
Josh Turner
Juan Jose Mendoza
Leonardo Hernandez
Ludwin Quintanilla
Martin Rangel
Miguel Hernandez
Nahun Lemus
Ricardo Cano
Sal Aguilar
Saul Arriaza
Steven Gernatt
Steven Sindall
Tierson Boutte
Tyler Baxter
Walter McClung
Yovaniel Rivera
Zach Moore
Explain injuries:
Injury Date
Injury Time
Injury Day of the Week
Please select...
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Injury Site Conditions (grade, terrain, proximity to targets, etc.)
Please select...
Grade
Terrain
Proximity to targets
Other
If Other, please explain:
Injury Environmental Conditions
Please select...
Heat
Sun
Rain
Wind
Other
If Other, please explain:
Injury Risk Anticipated and/or documented in Job Site Safety Briefing/in Pre-Job Safety?
Please select...
Yes
No
Please Explain Injury Risks Anticipated
Were there any damages?
Please select...
Yes
No
Type of Damage
Please select...
Property Damage
Equipment Damage
Other
Explain Damages:
How did the damage occur?
Did the damage occur at the client's property or at a different property? (neighbor, different unit, etc)
Please select...
Damage is at Client's Property
Damage is at a different property (neighbor, or different unit, etc.)
What is the address and contact information of where the damage took place?
Where on the property did the damage occur?
Was customer notified of damage?
Please select...
Yes
No
N/A
Additional Damage Information
Damage Date:
Damage Time
Please select...
7 am
7:15 am
7:30 am
7:45 am
8 am
8:15 am
8:30 am
8:45 am
9 am
9:15 am
9:30 am
9:45 am
10:00 am
10:15 am
10:30 am
10:45 am
11 am
11:15 am
11:30 am
11:45 am
12 pm
12:15 pm
12:30 pm
12:45 pm
1 pm
1:15 pm
1:30 pm
1:45 pm
2 pm
2:15 pm
2:30 pm
2:45 pm
3 pm
3:15 pm
3:30 pm
3:45 pm
4 pm
4:15 pm
4:30 pm
4:45 pm
5 pm
5:15 pm
5:30 pm
5:45 pm
6 pm
6:15 pm
6:30 pm
6:45 pm
7 pm pm
7:15 pm
7:30 pm
8 pm
after 8 pm
Damage Day of the Week
Please select...
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Damage Site Conditions (grade, terrain, proximity to targets, etc.)
Please select...
Grade
Terrain
Proximity to Targets
Other:
If Other, please explain:
Damage Environmental Conditions
Please select...
Heat
Sun
Rain
Wind
Other
If Other, please explain:
Damage Risk Anticipated and/or documented in Job Site Safety Briefing/in Pre-Job Safety?
Please select...
Yes
No
Please explain damage risks anticipated
Which workers were involved in the damage?
Please select...
Alex Soriano
Antulio Giron
Benjamin Johnston
Bryan Martinez Del Rello
Carlos Garcia
Christian Malcolm
Curtis Miller
Daniel Molina
Diego Ivan Martinez
Dirk Brown
Edward Kelemencky
Erick Reyes
Falarryo Buckley
Gabriel Martinez
Gerber Lopez
Gustavo Carillo
Isaiah Coffey
Israel Martinez
Jacob Jenkins
Jonathan Covarrubias
Jorge Antonio Araujo
Josh Turner
Juan Jose Mendoza
Juan Laracuente
Juells Dorton
Julio Cesar
Leonardo Hernandez
Marcelo Barrera
Marcos Martinez
Martin Rangel
Milton Polio
Nahun Lemus
Orlando Misael Diaz Morales
Osvaldo Martinez
Ricardo Cano
Sal Aguilar
Stephen "Fletch" Locke
Stephen Sindall
Sterling Copeland
Thomas Cross
Tierson Boutte
Tyler Baxter
Yovaniel Rivera
Zach Moore
How should fault be assigned?
Photos of damage
Pre-Photo 1
Pre-Photo 2
Pre-Photo 3
Pre-Photo 4
Photos
Photo 1
Photo 3
Photo 2
Photo 4
Do Not Remove
Work Order Type
Work Order ID
Contact Information